Multi-Plan Report for Projects

Multi-Plan Report for Projects

For an overview of all available Project Reports, go to: Overview of All Reports for SiteOwl Projects

Access the Multi-Plan Report from the Reports from two locations in SiteOwl:
  1. The Reports link in the Project Card: 


  2. The Download icon in the Project Plan view: 

General Configuration options allow you to customize the report based on your needs: 
  1. Select up to 20 Plans to include in the report.
  2. If your Plans contain Devices that are tightly clustered, select the High-Density Plans option for optimal print quality.  
  3. Pin Color can be set to Device Color, Install Status, or Operational Status, enabling you to use this report for different purposes.
  4. Include or exclude Coverage Areas, Connections and Secondary Devices.
  5. Limit the report to selected System Types, Operational Statuses, and Install Statuses. All are included by default.
The Pin size shown on the report is determined by your Project Plan view settings. To change this setting, navigate to the Project Plan, Filter options, then return to the Project's Reports tab to download the report. 


Column Configuration options allows for up to 8 columns of data to be included in the report. Your column selections will be remembered for the Account on which you're reporting. Click the Default option to return to the system default settings.


Click the image to view a full report sample:


    • Related Articles

    • Overview of All Reports for SiteOwl Projects

      SiteOwl Projects provides a number of downloadable reports that greatly enhance your ability to assess and share Project scope and status at any stage. Reports are accessible from either the Project Card or from the Plan view. This page outlines the ...
    • Numbered Plan Report for Projects

      For an overview of all available Project Reports, go to: Overview of All Reports for SiteOwl Projects Access the Numbered Plan Report from the Download option in the Project Plan view, then select the Numbered Plan Report Configure option: General ...
    • Icon Plan Report for Projects

      For an overview of all available Project Reports, go to: Overview of All Reports for Projects Access the Icon Plan Report from the Download options in the Project Plan view, then select the Icon Plan Report Configure option: General Configuration ...
    • Multi-Plan Report for Live Sites

      For an overview of all available Live Site Reports, go to: Overview of All Reports for SiteOwl Live Access the Multi-Plan Report from the Reports from two locations in SiteOwl: The Reports link in the Live Site Card: The Download icon in the Live ...
    • Connections Report for Projects

      For an overview of all available Project Reports, go here: Overview of All Reports for SiteOwl Projects Access the Connections Report from the Reports link in the Project Card: Click the image to view a full report sample: